FPSO Haewene Brim
Bluewater's Floating, Production, Storage and Offloading (FPSO) vessel Haewene Brim had a 35 day upgrade of its process plant and hull maintenance period refit. The vessel upgrade was carried out in a partnership between A&P Tyne Ltd. and McNulty Offshore Contractors Ltd. of South Shields.
The scope of work involved in the upgrading and dry-docking included:
- Fabrication of 300 tonnes of module steelwork
- Addition of Water injection, chemical and filtration skids to the process plant on deck
- Dry-docking & Marine systems upgrade
- Assisting McNulty Contractors Ltd. in the assembly, installation and commisioning of modules
- Hull blasting and painting
- Tank blasting and painting
 |
|
Haewene Brim in dock No.5
|
|
|