Project: Global Producer III – FPSO Upgrade
The vessel formerly operated on Kerr-McGee’s Leadon field. Ahead of its new role, it underwent an upgrade program at the A&P Tyne ship yard and McNulty’s fabrication site. The topsides re-fit and modifications were needed to allow the 54,500 metric ton, 217 m long vessel to handle Dumbarton’s crude, which is much lighter and with a higher gas content than Leadon’s.
Major Marine work carried out:
- Removal and full overhaul of three azimuth thrusters
- Removal and overhaul of ballast pumps
- Removal and overhaul of ship’s “Turret” mooring system
- Overhaul of all sea valves
- Classification Survey of vessel and associated works
- Survey, overhaul and modifications to inert gas systems
- Survey, overhaul and testing of life saving equipment
- Full hull preparation and painting
- Various piping modifications
- Survey and overhaul of cranes and deck machinery
- Galley and accommodation modifications
- Modifications and upgrade of ships towing arrangements
Major Topside work carried out:
- Fabrication of new PAU and skids
- New seawater caissons (2)
- New platforms, ladders & handrails
- Outfitting of PAU and skids (by McNulty)
- Deconstruct redundant plant and equipment
- Heavy lift installation of new units
- Connection and extension of utilities
- Commissioning and testing of new and replacement